Just now there is much of the work that has been done, started and finishing at the same time!!!
That is the hole instrument panel was delivered to me from WOKR member Sven Olof Johansson in Sweden .He called me on the phone and said that he had one panel with bezel and the temperature instrument with amp and oil with parts to the fuel. I had to make some parts to the fuel gauge and repair the copper line. The panel with the figures is a new scale being made. The gauges for speed and temperature are handed over to a shop that makes a new speed cable and sensor to the temp gauge ..
The panel and the inside window panels is delivered to the paint shop. The wood graining will start direct after that he had laid a layer of base paint. The pieces that going to be painted black is delivered to the paint shop.
The cylinder head was soldered with high temperature metal powder that melts in the crack. The head is then straightened and painted.
The brake cables is being done and new cables is made from an SAAB handbrake with little modifications. It means making rivets, cutting cable and making new ends.
When measuring the foot step rubber I got an idea of making a pattern from the wheel hub and make a bigger pattern in the rubber mat.