Engine work

The engine work is proceeding with mounting the muffler and the exhaust pipe with the stay that holds it in place. The distributor, condenser, cables, lock, breakers all adjusted and ready. The carburetor and the fuel pump is also in place and also the starter and generator. The small front rubber is cleaned and new rubber made. In all means READY to start for the first time.
It all went great some adjustments is to be taken care of for the carburetor and the starting motor. The battery seemed to small even that I used an 6V 84 Ah
The propeller shaft was a new made and it has been adjusted and welded in a shop.
The fenders is painted and ready to be mounted so is also the side plates between the body and the step plate.
The body has been delivered to the paint shop!!
The rear and front bumper is delivered to the chrome shop where I also collected the radiator shell and some others parts.
The fuel tank is mounted.

enginestart

body3